Valued Partners,
A site visit was conducted today with the intentions of inspecting the ASE 1 & 2 wells, and meeting with the ASE 3 drilling/operational team. Currently, we have drilled the surface hole to approximately 750 feet, ran surface casing, cemented the surface, and we are now waiting for the cement to cure before continuing the drilling process. We will post more drilling progression updates as the information becomes available. Watch the video below for a detailed look.