We hope this update finds you well. Please find below your August 2026 operational update for the ASE 3 well.

OPERATIONS UPDATE, AUGUST 2026

Status: Producing

August was a good month for the ASE 3. Having worked through the formation sand entry in July, the team installed a sand screen on the gas anchor, and the well has run with very few issues since. The sand screen is doing exactly what it was intended to do, protecting the pump from the formation sand that caused the two pump failures last month.

PRODUCTION, AUGUST 2026

Total oil produced: 814.12 barrels

Oil sales: 321.88 barrels (2 loads)

Total water produced: nil recorded

Two loads of oil were sold during August, totalling 321.88 barrels, with the balance of the month's production held in tank on the lease for future loads.

As always, your monthly financial statement is available through your investor account portal.

Our next scheduled investor portal update will be released on October 12th, 2026.